Farmers must follow these rules if they apply for payments under the basic payment scheme 2016.
There are changes to:
- SMR 8: sheep and goat identification. To reflect new identification rules for lambs intended for slaughter.
- GAEC 5: soil and carbon stock. Minimum land management site specific conditions to limit erosion: to allow farmers to leave a rough surface, where site specific conditions that limit soil erosion can be demonstrated. However, if soil erosion occurs you may still be in breach of GAEC 4.
- SMR 4: food and feed law: reflects new pre movement testing rules for cattle moving to or from common land.
- Useful contact factsheet: updated to include new contact details for EID Cymru.
The verifiable standards for 2016 have been updated to reflect the changes to SMR 8 and GAEC 5.
New guidance for farmers considering leaving land with a rough surface has been produced.
Documents
-
Cross compliance: verifiable standards 2016
-
Cross compliance: rough surface soil guidance
-
Cross compliance: rough surface soil (risk assessment notification)
-
Cross compliance: nitrate vulnerable zones (SMR 1) (2014)
-
Cross compliance: wild birds (SMR 2) (2014)
-
Cross compliance: conservation of fauna and flora (SMR 3) (2014)
-
Cross compliance: food and feed law (SMR 4) (2014)
-
Cross compliance: restrictions on substances having hormonal or thyrostatic action and beta-agonists (SMR 5) (2014)
-
Cross compliance: pig identification and registration (SMR 6) (2014)
-
Cross compliance: cattle identification and registration (SMR 7) (2014)
-
Cross compliance: sheep and goat identification and registration (SMR 8) (2016)
-
Cross compliance: prevention, control and eradication of transmissible spongiform encephalopathies (SMR 9) (2014)
-
Cross compliance: restrictions on using plant protection products (SMR 10) (2014)
-
Cross compliance: welfare standards for calves (SMR 11) (2014)
-
Cross compliance: welfare standards for pigs (SMR 12) (2014)
-
Cross compliance: welfare standards for farmed animals (SMR 13) (2014)
-
Cross compliance: establishment of buffer strips (GAEC 1) (2014)
-
Cross compliance: water for irrigation (GAEC 2) (2014)
-
Cross compliance: groundwater (GAEC 3) (2014)
-
Cross compliance: minimum soil cover (GAEC 4) (2014)
-
Cross compliance: managing land to limit soil erosion (GAEC 5) (2015)
-
Cross compliance: maintenance of soil and organic matter (GAEC 6) (2014)
-
Cross compliance: landscape features (GAEC 7) (2014)
-
Cross compliance: payment reduction matrix (2016)
