From: Monday 05 January 2015
To: Saturday 31 July 2021
Last updated 14:46 Friday 29 March 2019 : Use an alternative route.
Works | TfL
[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed. Find out more about Bank and Monument works
From: Monday 07 January 2019
To: Sunday 31 March 2019
Last updated 06:12 Saturday 30 March 2019 : Use an alternative route. Traffic is flowing well on diversion.
Works | Utility
Leadenhall Street and Cornhill (EC3) (Both Directions) at the junction of [A10] Bishopsgate - Closed in both directions during Reach Active works.
From: Monday 28 January 2019
To: Sunday 31 March 2019
Last updated 06:12 Saturday 30 March 2019 : Traffic is flowing well.
Works | TfL
[B504] Judd Street (WC1) (Both Directions) at the junction of [A501] Euston Road - The road is closed for junction improvement work and the installation of a cycle route. Additionally, [A501] Euston Road (Westbound), lane one (bus lane) closed, [A5202] Midland Road (Southbound), lane three closed.
From: Sunday 06 January 2019
To: Friday 30 April 2021
Last updated 14:47 Friday 29 March 2019 : Use an alternative route. Delays possible.
Works | Other
Melton Street (NW1) (Both Directions) at the junction of Euston Road - HS2 will be relocating the Euston Station Taxi rank from its current location in the station basement to the east side of Euston Square Gardens. The road is closed, except for taxi access to the new rank.
From: Monday 25 March 2019
To: Saturday 30 March 2019
Last updated 04:32 Saturday 30 March 2019 : Use an alternative route. Traffic is flowing well.
Works | Utility
Harley Street (W1B/W1G) (Southbound) at the junction of Marylebone Road - The road is closed to facilitate Thames Water works.
From: Thursday 11 January 2018
To: Monday 01 July 2019
Last updated 14:54 Friday 29 March 2019 : Use an alternative route. Delays are possible.
Works | Borough
Park Crescent (NW1/W1G/W1B) (Southbound) at the junction of [A501] Marylebone Road - Closed due to works by Westminster City Council.
From: Monday 07 January 2019
To: Monday 01 April 2019
Last updated 06:11 Saturday 30 March 2019 : Traffic is flowing well.
Works | TfL
[A5] Edgware Road (W2/W1H) (Both Directions) at the junction of Harrowby Street - Carriageway restrictions for Central London Grid Cycling Scheme. Burwood Place and Harrowby Street are closed. Temporary pedestrian signals are operating. The southbound bus lane is closed.
From: Monday 25 March 2019
To: Friday 19 April 2019
Last updated 15:58 Friday 29 March 2019 : Use an alternative route.
Works | TfL
North Carriage Drive (W2) (Both Directions) between Brook Street and Cumberland Gate - The road is closed to facilitate a new cycle project.
From: Saturday 02 March 2019
To: Saturday 27 April 2019
Last updated 06:10 Saturday 30 March 2019 : Use an alternative route. Traffic is flowing well on diversion.
Works | Other
Eastbourne Terrace (W2) (Both Directions) between Praed Street and Cleveland Terrace - Road closure to facilitate Crossrail works. (Saturday Only - 06:00 to 22:00)
From: Thursday 03 January 2019
To: Saturday 31 August 2019
Last updated 15:48 Friday 29 March 2019 : Expect delays.
Works | Utility
[[A4201] Albany Street (All Directions) at the junction of Gloucester Gate - Temporary traffic lights are in use to enable works by Thames Water. Gloucester Gate is closed.
From: Wednesday 09 January 2019
To: Friday 10 May 2019
Last updated 16:01 Friday 29 March 2019 : Delays are possible.
Works | Borough
[A23] Kennington Road (SE1) (Northbound) at the junction of Westminster Bridge Road - Various restrictions until approximately mid-May during junction improvement works. All approaches to the junction are restricted. Hercules Road is closed to traffic.
From: Wednesday 27 February 2019
To: Monday 08 April 2019
Last updated 04:54 Saturday 30 March 2019 : There are no reported delays.
Works | Borough
[A239] Cricket Green (CR4) (Westbound) between Madeira Road and London Road - Road closed to facilitate works by the London Borough of Merton.
From: Tuesday 05 March 2019
To: Wednesday 03 April 2019
Last updated 21:18 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A118] Romford Road (E7) (Eastbound) between Sprowston Road and Woodgrange Road - The carriageway has been reduced to one lane for sewer repairs.
From: Thursday 21 March 2019
To: Sunday 19 May 2019
Last updated 16:31 Friday 29 March 2019 : Expect delays.
Works | Utility
Laurie Grove (SE14) (Southbound) at the junction of New Cross Road - The road is closed for gas works.
From: Saturday 30 March 2019
To: Ongoing
Last updated 06:58 Saturday 30 March 2019 : Use an alternative route.
Traffic Incidents | Collision
[A2210] Brookmill Road (SE8) (All Directions) at the junction of Elverson Road - Road is blocked in both directions due to a collision.
From: Friday 05 October 2018
To: Ongoing
Last updated 16:57 Friday 29 March 2019 : A limited service is in operation on the Woolwich Ferry.
Works | TfL
[A2204] Woolwich Ferry (Both Directions) - Currently running a limited service during operating hours. Normal operating hours; Monday to Saturday, and public holidays, 0610hrs to 2000hrs and Sunday 1130hrs to 1930hrs, with the last northbound trip 1915hrs. More information. More information.
From: Sunday 24 March 2019
To: Sunday 16 June 2019
Last updated 16:35 Friday 29 March 2019 : Expect delays.
Works | Utility
Epsom Road (CR0) (Both Directions) between Waddon Road and Duppas Hill Road - Road will be closed to all traffic to facilitate multiple collaborative works with Thames Water, Southern Gas Networks and Croydon Council.
From: Saturday 30 March 2019
To: Ongoing
Last updated 06:52 Saturday 30 March 2019 : Traffic is flowing well on diversion.
Traffic Incidents | Collision
[A5] Maida Vale (W9) (All Directions) at the junction of Clifton Road - The road is closed due to a collision.
From: Wednesday 04 January 2017
To: Saturday 31 December 2022
Last updated 14:45 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A3211] Victoria Embankment (EC4) (Both Directions) between [A201] Blackfriars Bridge and Horse Guards Avenue - Various carriageway restrictions have been implemented for the Tideway works. A diversion is in place for traffic wishing to access [A3211] Victoria Embankment westbound. Northbound traffic on [A201] Blackfriars Road is diverted via [A3200] Stamford Street, [A301] Waterloo Bridge, [A4] Strand, Arundel Street and Temple Place. Southbound traffic on [A201] New Bridge Street is diverted via [A4] Fleet Street, [A4] Strand, Arundel Street and Temple Place. The Cycle Superhighway has a new layout. Find out more about the road changes at Victoria Embankment.
From: Thursday 14 March 2019
To: Tuesday 10 September 2019
Last updated 14:53 Friday 29 March 2019 : Traffic is flowing well.
Works | Utility
[A201] Blackfriars Road (SE1) (Northbound) at the junction of Upper Ground - Lane one (of two) is blocked. The left turn has been banned to facilitate works on Upper Ground to take place. Upper Ground is closed.
From: Friday 29 March 2019
To: Sunday 31 March 2019
Last updated 06:13 Saturday 30 March 2019 : Use an alternative route. Traffic is flowing well on diversion.
Works | Utility
[A1211] Minories (EC3N) (Southbound) between the junction of India Street and Goodman's Yard - The road is closed due to emergency Thames Water works.
From: Thursday 03 January 2019
To: Sunday 31 March 2019
Last updated 15:41 Friday 29 March 2019 : Use an alternative route. Delays are possible.
Works | Borough
Lupus Street (SW1V) (Both Directions) between Grosvenor Road and Westmoreland Terrace - The road is closed for gas main replacement on behalf of Westminster City Council.
From: Monday 11 March 2019
To: Saturday 20 April 2019
Last updated 16:00 Friday 29 March 2019 : Use an alternative route. Delays are possible.
Works | Borough
[A4] Pall Mall (Eastbound) between Waterloo Place and [A4] Haymarket - Closed during junction improvement works on behalf of Westminster council.
From: Monday 28 January 2019
To: Tuesday 30 November 2021
Last updated 14:46 Friday 29 March 2019 : Delays are possible.
Special and Planned Events | Construction Activity
Soho Place, [A400] Charing Cross Road (WC2) (Northbound) at the junction of Sutton Row and [A40] St Giles High Street - Lane restrictions and heavier traffic flow than usual expected until approximately late 2021 during works related to the "Soho Place" development.
From: Friday 21 December 2018
To: Saturday 30 March 2019
Last updated 06:12 Saturday 30 March 2019 : Use an alternative route.
Works | Borough
[A5202] Goods Way (All Directions) at the junction of Pancras Road - The road is closed eastbound for local authority works.
From: Monday 07 January 2019
To: Monday 06 January 2020
Last updated 17:13 Friday 29 March 2019 : Expect delays.
Works | Utility
Rye Lane (SE15) (Both Directions) between Highshore Road and Heaton Road - Road closure due to gas main replacement work.
From: Friday 08 June 2018
To: Monday 11 November 2019
Last updated 15:38 Friday 29 March 2019 : Expect delays.
Works | TfL
Highbury Corner Roundabout, Highbury Corner (N1) (All Directions) - The carriageway is restricted for gyratory scheme work. The road will be closed for resurfacing between 2000hrs and 0500hs on Monday 8th, Tuesday 9th and Wednesday 10th April inclusive. Expected to switch to two-way traffic over the Easter weekend, Friday 19 to Monday 22 April. More information
From: Sunday 13 March 2016
To: Sunday 31 March 2019
Last updated 21:18 Friday 29 March 2019 : Delays are possible.
Works | TfL
Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions in place during bridge replacement works. Find out more about the Ardleigh Green bridge replacement.
From: Monday 12 March 2018
To: Sunday 05 January 2020
Last updated 17:11 Friday 29 March 2019 : Expect delays.
Works | TfL
[A3] North Side Wandsworth Common (SW18) (Westbound) at the junction of Huguenot Place and Woodwell Street - Lane four (of four) is closed for road works and crane operations. Lane one (of two) on Woodwell Street is closed between North Side Wandsworth Common and East Hill.
From: Saturday 16 February 2019
To: Friday 12 April 2019
Last updated 17:10 Friday 29 March 2019 : Expect delays.
Works | Utility
[A205] London Road (SE23) (Westbound) at the junction of Sydenham Hill - One lane closed to facilitate works by Thames Water.
From: Saturday 13 October 2018
To: Thursday 31 October 2019
Last updated 17:12 Friday 29 March 2019 : Expect delays.
Special and Planned Events | Construction Activity
[B210] Artillery Place (Both Directions) at the junction of Belford Grove - Two way temporary traffic signals are operating a single alternate lane for construction works.
From: Friday 29 March 2019
To: Friday 05 April 2019
Last updated 03:00 Saturday 30 March 2019 : Traffic is flowing well.
Works | Emergency
[A243] Leatherhead Road (KT9) (Both Directions) at the junction of Silverglade - Temporary signals in operation to facilitate emergency works by Thames Water.
From: Thursday 07 February 2019
To: Saturday 30 March 2019
Last updated 01:46 Saturday 30 March 2019 : Traffic is flowing well.
Works | Emergency
[A3] Kingston Bypass (Southbound) between Tolworth Underpass (A240) and Hook Underpass (A243) - Lane one (of three) is closed for emergency barrier work.
Provisional dates:
From: Monday 01 January 2018
To: Wednesday 01 January 2020
Last updated 14:06 Friday 29 March 2019
Works | TfL Works
Gyrathory changes to two way flows
Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021
Last updated 14:06 Friday 29 March 2019
Works | TfL Works
Twickenham Bridge, Bridge Concrete repairs and waterproofing.
From: Monday 29 May 2017
To: Monday 30 November 2020
Last updated 14:49 Friday 29 March 2019 : Delays are possible.
Works | TfL
[A4] Brompton Road (SW3) (Westbound) after the junction of [A4] Knightsbridge (Scotch Corner) - Lane one (of three) closed until late 2020 during station upgrade works.
From: Wednesday 13 March 2019
To: Friday 05 April 2019
Last updated 15:33 Friday 29 March 2019 : Expect delays.
Works | Utility
[A4] Colnbrook By-pass (UB7) (Eastbound) at the junction of Bath Road - There is a lane two closure in place due to Thames Water works.
From: Saturday 28 May 2016
To: Tuesday 31 December 2019
Last updated 15:39 Friday 29 March 2019 : Delays are possible.
Works | Other
[A306] Hammersmith Bridge (W6) (Both Directions) - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished. Pedestrian access is maintained throughout. More information on the London Borough of Hammersmith & Fulham's website.
From: Monday 11 February 2019
To: Friday 10 May 2019
Last updated 15:47 Friday 29 March 2019 : Expect delays.
Works | Other
[A1055] Meridian Way (N18/N17) (Northbound) between Leeside Road and Angel Road - Lane one (of two) closed to facilitate the construction of a new railway station.
Provisional dates:
From: Friday 01 September 2017
To: Friday 31 December 2021
Last updated 14:06 Friday 29 March 2019
Works | TfL Works
CS11 and Brent Cross Cricklewood Regeneration
From: Monday 20 June 2016
To: Friday 19 April 2019
Last updated 15:37 Friday 29 March 2019 : Expect delays.
Works | TfL
Power Road Bridge, [A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - Various restrictions during bridge replacement works. More information on the Power Road Bridge project.
From: Saturday 29 August 2015
To: Sunday 04 August 2019
Last updated 14:54 Friday 29 March 2019 : Delays are possible.
Works | TfL
[A3] King William Street (EC3R/EC4R) (northbound) between London Bridge and Arthur Street - Lane one is closed from London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website
From: Monday 24 July 2017
To: Tuesday 30 April 2019
Last updated 16:01 Friday 29 March 2019 : Delays are possible.
Works | Borough
Baker Street two-way scheme, [A41] Baker Street and [A41] Gloucester Place (All Directions) between [A41] Park Road and [A41] Portman Square - Baker Street and Gloucester Place are now operating with two way traffic.
From: Monday 05 March 2018
To: Tuesday 31 March 2020
Last updated 14:51 Friday 29 March 2019 : Delays are possible.
Works | Other
The West End Project, [A400] Tottenham Court Road (W1T) (Northbound) between Oxford Street and Euston Road - Various lane closures and temporary signals in place due to "The West End Project". Temporary traffic signals are operating at St Giles Circus. Monday 18 March until Monday 11 April, inclusive, reduced to a single lane, at times, during road resurfacing works. Expected to switch to two-way traffic over the Easter weekend, Friday 19 to Monday 22 April. More information on Camden council's website.
From: Monday 23 July 2018
To: Wednesday 20 July 2022
Last updated 14:45 Friday 29 March 2019 : Delays are possible.
Works | Utility
Tideway Tunnel Project, [A3212] Chelsea Embankment (SW11/SW3) (Both Directions) between Embankment Gardens and Chelsea Bridge - Various lane restrictions during Tideway Tunnel Project works. A new road layout in place, which remains for the duration of the works. Additionally, Friday 1 March between approximately 2200hrs and 0500hrs temporary traffic signals in operation. More information on the Thames Tideway website.
From: Monday 25 March 2019
To: Monday 22 April 2019
Last updated 16:37 Friday 29 March 2019 : Expect delays.
Works | Borough
[A2199] South Croxted Road (Both Directions) at the junction of Park Hall Road - There are temporary traffic lights in place to facilitate resurfacing works.
From: Monday 25 March 2019
To: Friday 05 April 2019
Last updated 15:47 Friday 29 March 2019 : Expect delays.
Works | Utility
[A404] Rickmansworth Road (HA6) (Both Directions) at the junction of Green Lane - There are lane closures in place to facilitate Thames Water works.
From: Tuesday 26 March 2019
To: Monday 01 April 2019
Last updated 04:52 Saturday 30 March 2019 : There are no reported delays.
Works | Utility
[A214] Crown Dale (SE19) (All Directions) at the junction of Beulah Hill - Temporary traffic signals in place due to Thames Water works.
From: Wednesday 20 March 2019
To: Thursday 04 April 2019
Last updated 15:53 Friday 29 March 2019 : Delays are possible.
Works | Borough
[A5204] Seymour Street (W1H) (All Approaches) at the junction of Great Cumberland Place - There are temporary traffic lights in operation to facilitate works.
From: Thursday 28 March 2019
To: Saturday 30 March 2019
Last updated 15:33 Friday 29 March 2019 : Expect delays.
Works | Utility
[A5] Kilburn High Road (NW6) (Northbound) at the junction of Oxford Road - The footway is restricted for BT work.
From: Wednesday 20 March 2019
To: Friday 05 April 2019
Last updated 04:51 Saturday 30 March 2019 : No reported delays.
Works | Utility
[A308] Hampton Court Road (TW12) (Both Directions) at the junction of Hogarth Way - Two-way temporary traffic signals are in operation due to roadworks.
From: Sunday 21 January 2018
To: Monday 11 November 2019
Last updated 17:14 Friday 29 March 2019 : Expect delays.
Works | Borough
[A307] Wheatfield Way (All Directions) at the junction of College Roundabout (Kingston) - Various lane closures and restrictions between College Roundabout and Orchard Road for the 'Mini-Holland' scheme.
From: Sunday 24 March 2019
To: Thursday 25 July 2019
Last updated 17:10 Friday 29 March 2019 : Expect delays.
Works | Borough
West Parkside (SE10) (All Directions) at the junction of John Harrison Way - There are lane restrictions in place for eastbound and westbound closure to facilitate resurfacing works.
From: Wednesday 27 March 2019
To: Monday 01 April 2019
Last updated 02:19 Saturday 30 March 2019 : Traffic is flowing well.
Works | Emergency
[A206] Romney Road (SE10) (All Directions) at the junction of King William Walk - Temporary signals in operation due to a burst water main.
From: Wednesday 27 March 2019
To: Wednesday 10 April 2019
Last updated 06:36 Saturday 30 March 2019 : Traffic is flowing well.
Special and Planned Events | Construction Activity
[A104] Lea Bridge Road (E5) (Westbound) at the junction of Hillstowe Street - There is a lane restriction in place to facilitate construction works.
From: Friday 08 January 2016
To: Wednesday 31 July 2019
Last updated 21:17 Friday 29 March 2019 : Delays possible.
Works | Borough
[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Various restrictions for Mini-Holland cycle scheme works. Temporary traffic signals are currently in operation at the Argall Way / Orient Way junction. More information on the Mini-Holland schemes.
From: Tuesday 03 May 2011
To: Sunday 07 April 2019
Last updated 15:55 Friday 29 March 2019 : Delays are possible.
Works | TfL
Victoria Area (All Directions) - Due to two ongoing major engineering projects (Victoria Station Upgrade and Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system. Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place. In addition Hudson's Place is restricted to taxis only. [A302] Victoria Street is restricted between [A202] Bressenden Place and [A3214] Buckingham Palace Road. Find out more..
Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021
Last updated 14:06 Friday 29 March 2019
Works | TfL Works
Vauxhall Bridge, Bridg - Repainting and waterproofing
From: Monday 04 March 2019
To: Thursday 04 April 2019
Last updated 21:18 Friday 29 March 2019 : Traffic delays are possible.
Infrastructure Issue | Traffic Signal
Selborne Road (E17) (All Approaches) at the junction of Hoe Street - The bus lane is closed and there are temporary traffic lights in operation to facilitate works.
From: Tuesday 05 March 2019
To: Friday 05 July 2019
Last updated 21:17 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A1112] Rainham Road South (Both Directions) between Dagenham Road and Reede Road - Various restrictions and temporary signals in place for the duration of the works.
From: Monday 01 October 2018
To: Sunday 01 March 2020
Last updated 17:11 Friday 29 March 2019 : Expect delays.
Works | Borough
[A308] Kingston Vale (SW15) (Both Directions) at the junction of Robin Hood Place - There are various lane closures and temporary traffic lights in operation due to works for the Go Cycle/Mini Holland cycle lane scheme.
From: Thursday 31 January 2019
To: Sunday 31 March 2019
Last updated 15:50 Friday 29 March 2019 : Expect delays.
Works | Borough
Mini Holland Cycle Scheme, [A1010] Hertford Road (N9) (All Directions) at the junction of Bounces Road - Temporary traffic signals are in operation. Bury Street and Rosemary Avenue are closed.
From: Monday 18 June 2018
To: Saturday 30 March 2019
Last updated 17:14 Friday 29 March 2019 : Expect delays.
Works | Borough
[A2212] Baring Road (SE12) (All Directions) between Downham Way and Chinbrook Road - Carriageway restrictions and temporary signals are in place due to public realm redevelopment works.
From: Tuesday 29 May 2018
To: Monday 02 September 2019
Last updated 15:41 Friday 29 March 2019 : Expect delays.
Works | Other
[A244] Hounslow Road (TW14/TW13) (Both Directions) between New Road and [B3377] Hanworth Road - Single alternate lane traffic with temporary traffic signals in operation for collaborative works on behalf of Network Rail and Hounslow council. More information is available on the Hounslow's website.
From: Monday 25 February 2019
To: Thursday 30 May 2019
Last updated 16:32 Friday 29 March 2019 : Expect delays.
Works | Borough
[A206] Trafalgar Road (Both Directions) between Blackwall Lane and Christchurch Way - Various restrictions in place to facilitate the Low Emission Neighbourhood Trafalgar Road Improvement Scheme. The cycle lane is closed westbound near Vanbrugh Hill and Christchurch Way.
From: Thursday 05 October 2017
To: Sunday 31 March 2019
Last updated 21:18 Friday 29 March 2019 : Delays possible.
Works | Borough
[A104] Whipps Cross Roundabout (All Directions) - Various restrictions and temporary signals in place as part of a carriageway widening and resurfacing scheme for Waltham Forest Borough Council. The roundabout has been replaced by a 'T' junction.
From: Monday 30 April 2018
To: Friday 31 May 2019
Last updated 14:55 Friday 29 March 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[A40] Oxford Street (W1) (Both Directions) between [A400] Tottenham Court Road (St Giles Circus) and Rathbone Place - Various closures for a new development in the area. There are currently restrictions in place westbound.
From: Monday 04 February 2019
To: Thursday 07 November 2019
Last updated 14:52 Friday 29 March 2019 : Delays are possible.
Works | Borough
[A40] New Oxford Street (WC1A) (Eastbound) at the junction of Museum Street - Lane one (of two) is restricted due to works on behalf of Camden council related to the "West End Project". More information on Camden council's website.
From: Monday 07 January 2019
To: Sunday 07 July 2019
Last updated 17:14 Friday 29 March 2019 : Expect delays.
Works | Other
Camberwell Town Centre Scheme, [A215] Denmark Hill (SE5) (Both Directions) between Orpheus Street and Ashworth Close - Various restrictions in place for the Camberwell Town Centre Scheme works.
From: Monday 14 January 2019
To: Thursday 31 October 2019
Last updated 15:46 Friday 29 March 2019 : Expect delays.
Works | Borough
[A1055] Watermead Way (N17) (All Directions) at the junction of Hale Road and The Hale and Ferry Lane and Monument Way - Various lane restrictions and phased closures for a major Borough Highway Scheme.
From: Monday 04 March 2019
To: Sunday 18 August 2019
Last updated 15:46 Friday 29 March 2019 : Expect delays.
Works | TfL
[A503] Monument Way (N17/N15) (Eastbound) at the junction of The Hale - Lane one (of three) is closed due to works.
From: Monday 25 March 2019
To: Monday 01 April 2019
Last updated 17:17 Friday 29 March 2019 : Expect delays.
Works | Utility
[A10] Kingsland Road (E8) (Northbound) at the junction of Downham Road - Lane one (of two) closed during Tri-Connex gas works.
From: Sunday 17 March 2019
To: Sunday 31 March 2019
Last updated 18:35 Friday 29 March 2019 : Expect delays.
Hazard(s) | Burst Water Main
[A205] Westhorne Avenue (SE12) (All Directions) at the junction of Woodyates Road - There is a water leak in the carriageway.
From: Monday 11 February 2019
To: Friday 05 April 2019
Last updated 16:10 Friday 29 March 2019 : Expect delays.
Works | TfL
[A21] Bromley Road (SE6) (Both Directions) at the junction of Crantock Road - Temporary traffic signals in use during junction improvement works. .
From: Monday 04 March 2019
To: Sunday 30 June 2019
Last updated 16:07 Friday 29 March 2019 : Expect delays.
Works | Utility
[A23] Brixton Road (SW9) (Northbound) between Lorn Road and Hillyard Street - Bus lane closed to facilitate works by SGN. A temporary 20mph speed limit is in force.
From: Thursday 03 August 2017
To: Thursday 26 September 2019
Last updated 14:52 Friday 29 March 2019 : Delays are possible.
Works | TfL
[A23] Kennington Road (SE11) (Northbound) at the junction of Clayton Street - The road has been reduced to one lane in both directions for London Underground upgrade works.
From: Thursday 06 September 2018
To: Monday 30 September 2019
Last updated 17:11 Friday 29 March 2019 : Exercise caution.
Works | Other
[A24] Balham High Road (SW17) (Both Directions) at the junction of Upper Tooting Park - The parking bays are restricted for works. From 0800hrs Tuesday 2 until 1700hrs Friday 5 April, reduced to a single lane southbound.
From: Wednesday 27 March 2019
To: Sunday 31 March 2019
Last updated 16:55 Friday 29 March 2019 : Expect delays.
Works | Utility
[A240] Kingston Road (KT4/KT5/KT9) (Northbound) at the junction of Jubilee Way - Lane one (of three) closure for Thames Water utility connection works.
From: Monday 25 March 2019
To: Monday 01 April 2019
Last updated 16:38 Friday 29 March 2019 : Expect delays.
Works | Utility
[A3205] Battersea Park Road (SW11) (Eastbound) approaching the junction of Kirtling Street - Lane one (of three) closed during UKPN works.
From: Monday 18 March 2019
To: Monday 03 June 2019
Last updated 16:34 Friday 29 March 2019 : Expect delays.
Works | TfL
[A3205] Nine Elms Lane (southbound) at the junction of Cringle Street - Lane one (of two) is closed to facilitate works.
From: Tuesday 26 March 2019
To: Ongoing
Last updated 16:57 Friday 29 March 2019 : Expect delays.
Works | TfL
[A3205] Nine Elms Lane (SW11/SW8) (All Directions) at the junction of Ponton Road - Various lane closures in place for Thames Tideway Works. Sunday 24 February, single alternate lane working under temporary traffic signal control between approximately 2200hrs and 0500hrs.
From: Tuesday 05 June 2018
To: Monday 01 April 2019
Last updated 17:13 Friday 29 March 2019 : Expect delays.
Works | Other
Prince Of Wales Drive (SW8) (Both Directions) between Battersea Park Road and Queenstown Road - Pavement closures implemented when necessary due to construction work. Possible carriageway restrictions to maintain pedestrian access at times.
From: Tuesday 03 May 2016
To: Tuesday 30 April 2019
Last updated 16:00 Friday 29 March 2019 : Delays are possible.
Works | Borough
[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - The carriageway will be restricted at various times until April 2019 for the redevelopment of 55-91 Knightsbridge. The westbound bus lane is closed until April 2019. Additionally, the bus lane is closed from Old Barrack Yard to William Street until 30/09/19 during the redevelopment of the Berkeley Hotel. More information available on Westminster council's website.
From: Monday 18 March 2019
To: Tuesday 31 December 2019
Last updated 15:40 Friday 29 March 2019 : Expect delays.
Works | TfL
Cycle route Wood Lane to Acton, [A40] Western Avenue (Westbound) between [A219] Wood Lane (White City) and Gypsy Corner (A4000) - Works are expected to be off-carriageway until Monday 8 April, after which lane one (of three) will be be closed until late 2019 for the construction of the new cycle route. More information on the new cycle route.
From: Monday 21 January 2019
To: Wednesday 31 July 2019
Last updated 15:37 Friday 29 March 2019 : Expect delays.
Works | TfL
Gunnersbury Avenue safety scheme, [A406] Gunnersbury Avenue (North Circular Road) (W3) (Both Directions) near the junction of Manor Gardens - The carriageway will be restricted for a safety scheme. From Friday 29 March there will be no right-turn from side roads onto the [A406] between Park Place and Power Road. This will be a permanent change. More information.
From: Friday 29 March 2019
To: Tuesday 02 April 2019
Last updated 06:28 Saturday 30 March 2019 : Traffic is flowing well.
Works | Utility
[A41] Finchley Road (NW3) (Both Directions) near the junction of Ingham Road - Lane three (of three) closed in both directions during Thames Water works.
From: Thursday 28 March 2019
To: Wednesday 03 April 2019
Last updated 15:52 Friday 29 March 2019 : Approach with caution.
Hazard(s) | Other
[A5] Edgware Road (W2) (Northbound) at the junction of Cuthbert Street - Footway is restricted due to Cadent Gas work.
From: Monday 26 November 2018
To: Sunday 26 May 2019
Last updated 16:02 Friday 29 March 2019 : Delays are possible.
Works | TfL
[A10] Bishopsgate (EC2N/EC2M) (Both Directions) at the junction of Camomile Street - Various restrictions in use to facilitate junction improvement works. During most phases of the work, the restrictions will be confined to the pavement.
From: Wednesday 27 March 2019
To: Ongoing
Last updated 06:50 Saturday 30 March 2019 : Traffic is flowing well.
Infrastructure Issue | Traffic Signal
[A1203] The Highway (E1W/E1) (All Directions) at the junction of Wapping Lane - The traffic signals have been hit in a collision.
From: Monday 04 February 2019
To: Tuesday 24 December 2019
Last updated 14:52 Friday 29 March 2019 : Delays are possible.
Special and Planned Events | Construction Activity
Pentonville Road (N1) (Southbound) at the junction of King's Cross Bridge and Gray's Inn Road - Planned carriageway restrictions are no longer in place. However, the eastbound south side footway is closed for building works.
From: Saturday 30 March 2019
To: Friday 05 April 2019
Last updated 05:53 Saturday 30 March 2019 : Traffic is flowing well.
Works | Utility
[A11] Whitechapel High Street (Eastbound) at the junction of Commercial Street - Cycle Super Highway restriction to facilitate urgent Thames Water works.
From: Monday 07 January 2019
To: Sunday 28 February 2021
Last updated 14:47 Friday 29 March 2019 : Delays are possible.
Works | TfL
Old Street Roundabout (All Directions) - Various restrictions in place during junction improvement works. Lane closures will be in place on City Road and Old Street (2030-0530hrs) on Mon-Sat nights until 5 April 2019. The subway and ramps between street level on the south-eastern side of the roundabout and Old Street station are closed from approximately Tuesday 7 May. The switch to two-way traffic, once the south-eastern side of the roundabout is closed to traffic, is expected to be complete by late May. More information.
From: Monday 11 March 2019
To: Sunday 31 March 2019
Last updated 15:47 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A5200] York Way (N1) (Northbound) between Euston Road and Caledonia Street - The loading bay is partially obstructed by Cadent Gas works.
From: Monday 25 June 2018
To: Monday 13 April 2020
Last updated 14:49 Friday 29 March 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[A3212] Millbank Roundabout (SW1) (All Directions) junction with [B323] Horseferry Road and Lambeth Bridge - The carriageway is restricted for construction work.
From: Monday 25 March 2019
To: Sunday 31 March 2019
Last updated 15:44 Friday 29 March 2019 : Delays are possible.
Special and Planned Events | Other
[A3036] Lambeth Palace Road (All Directions) at the junction of Lambeth Bridge - Vehicles to be parked on the wide footway to facilitate filming. Members of public able to pass freely at all times.
From: Monday 04 February 2019
To: Sunday 14 April 2019
Last updated 15:56 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A3212] Chelsea Embankment (SW3/SW11) (Eastbound) at the junction of Oakley Street - Footway restrictions due to gas work.
From: Friday 29 March 2019
To: Thursday 04 April 2019
Last updated 00:16 Saturday 30 March 2019 : Traffic is flowing well.
Works | Emergency
Oldfield Lane North (UB6) (All Directions) at the junction of Rockware Avenue - Lane closures due to a burst water main and emergency repairs.
From: Saturday 30 March 2019
To: Ongoing
Last updated 06:22 Saturday 30 March 2019 : Approach with care and caution.
Traffic Incidents | Collision
[A118] Romford Road (E12) (All Directions) between High Street North and Little Ilford Lane - The police are attending a vehicle collision.
From: Thursday 28 March 2019
To: Wednesday 03 April 2019
Last updated 15:35 Friday 29 March 2019 : Expect delays.
Works | Emergency
[A502] Golders Green Road (NW11) (All Directions) at the junction of Hoop Lane - Temporary signals are operating due to a burst water main.
From: Thursday 28 March 2019
To: Monday 08 April 2019
Last updated 15:54 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A315] Kensington High Street (W8) (Westbound) at the junction of Wright's Lane - Lane one (of two) closed due to roads by Thames Water.
From: Monday 29 October 2018
To: Thursday 23 December 2021
Last updated 17:12 Friday 29 March 2019 : Expect delays.
Works | Utility
[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Bronze Street - Contraflow in place, reducing both directions to one lane, for Thames Tideway works.
From: Thursday 28 March 2019
To: Wednesday 03 April 2019
Last updated 06:28 Saturday 30 March 2019 : Traffic is flowing well.
Works | Utility
[A402] Shepherd's Bush Green (W12/W14) (Westbound) at the junction of Rockley Road - Lane four is closed for water works.
From: Sunday 07 October 2018
To: Sunday 31 March 2019
Last updated 15:50 Friday 29 March 2019 : Expect delays.
Works | Other
[A400] Hampstead Road (NW1) (Both Directions) at the junctions of Granby Terrace and Robert Street- Various restrictions during HS2-related works. The bus lane is closed in both directions. Temporary traffic signals are operating at Granby Terrace. Width restrictions southbound opposite the junction of Robert Street.
From: Friday 29 March 2019
To: Ongoing
Last updated 06:27 Saturday 30 March 2019 : No delays have been reported.
Infrastructure Issue | Traffic Signal
[A1055] Watermead Way (N17) (All Directions) at the junction of Cygnet Way - The signals are all out.
From: Monday 04 March 2019
To: Tuesday 02 April 2019
Last updated 15:49 Friday 29 March 2019 : Delays are possible.
Works | Utility
[B402] Long Acre (WC2E) (Both Directions) between Garrick Street and Bow Street - Carriageway restrictions in place due to works.
From: Monday 25 March 2019
To: Friday 12 April 2019
Last updated 15:52 Friday 29 March 2019 : Expect delays.
Works | Utility
[A504] West Green Road (N15) (All Directions) at the junction of Avenue Road - Temporary signals in place due to gas works.
From: Wednesday 27 March 2019
To: Thursday 04 April 2019
Last updated 06:52 Saturday 30 March 2019 : Diverted traffic is flowing well.
Works | Emergency
[A503] Pratt Street (Westbound) between Bayham Street and Camden High Street - Road closed for repairs to a burst water main.
From: Tuesday 05 March 2019
To: Saturday 18 May 2019
Last updated 16:02 Friday 29 March 2019 : Delays are possible.
Works | Borough
[A40] High Holborn (WC1V/WC2B) (Westbound) between Procter Street and Southampton Row - Lane four (of four) is blocked due to works behalf of London Borough Of Camden.
From: Wednesday 20 February 2019
To: Saturday 30 March 2019
Last updated 15:40 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A217] Wandsworth Bridge Road (SW6) (Both directions) at the junction of Ryecroft Street - Carriageway restriction during maintenance works.
From: Monday 04 March 2019
To: Friday 05 April 2019
Last updated 21:17 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A112] High Road Leyton (E10) (All Directions) at the junction of Skeltons Lane - Two way temporary signals in operation for utility connection works.
From: Tuesday 19 March 2019
To: Wednesday 03 April 2019
Last updated 15:36 Friday 29 March 2019 : Expect delays.
Works | Utility
[A402] Notting Hill Gate (Eastbound) at the junction of Pembridge Gardens - The carriageway has been restricted for gas works.
From: Monday 24 July 2017
To: Sunday 31 March 2019
Last updated 15:43 Friday 29 March 2019 : Delays are possible.
Works | Other
[A5201] Clerkenwell Road (EC1M) (Both Directions) at the junction of Britton Street - The carriageway is restricted for building works.
From: Tuesday 26 March 2019
To: Ongoing
Last updated 06:26 Saturday 30 March 2019 : Approach with caution.
Infrastructure Issue | Traffic Signal
[A124] Barking Road (E6) (Both Directions) at the junction of Creighton Avenue - The traffic signals at this location are not operating.
From: Saturday 23 March 2019
To: Saturday 18 May 2019
Last updated 15:37 Friday 29 March 2019 : Expect delays.
Works | Utility
[A4020] Uxbridge Road (W12) (All Directions) between Bloemfontein Road and Lime Grove - Various lane closures will be in place to facilitate Virgin Media works. Temporary traffic signals will also be in operation during occasional weekends and bank holidays.
From: Tuesday 26 March 2019
To: Monday 08 April 2019
Last updated 15:51 Friday 29 March 2019 : Expect delays.
Works | Utility
[A5] Edgware Road (NW9) (All Directions) at the junction of Capitol Way - Temporary traffic signals are in operation due to water works.
From: Thursday 14 September 2017
To: Thursday 31 December 2020
Last updated 14:48 Friday 29 March 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[A400] Charing Cross Road (WC2H) (Southbound) between Tottenham Court Road Underground Station South Plaza and Denmark Street - The bus lane is closed for the consolidated building development until late into 2020.
From: Monday 25 March 2019
To: Sunday 19 May 2019
Last updated 16:37 Friday 29 March 2019 : Expect delays.
Works | Utility
[A305] Richmond Road (TW1) (All Directions) at the junction of Crown Road - Restrictions due to gas main replacement works. From 0800 Monday 25 March until 0800 Monday 08 April 2019 there will two way temporary traffic lights in place, from 0800hrs Monday 08 April until 18:00 Sunday 19 May 2019 there will be an eastbound directional closure towards Richmond.
From: Friday 29 March 2019
To: Tuesday 02 April 2019
Last updated 04:52 Saturday 30 March 2019 : No reported delays.
Works | Other
[B232] Norwood High Street (SE27) (All Directions) at the junction of Chapel Road - Temporary traffic signals in operation to facilitate Thames Water works.
From: Thursday 21 March 2019
To: Friday 21 June 2019
Last updated 15:38 Friday 29 March 2019 : Expect delays.
Works | Borough
[A402] Goldhawk Road (W6/W12) (All Directions) at the junction of Stamford Brook Road - Lane restrictions and temporary signals in place due to junction moderisation works.
From: Saturday 23 March 2019
To: Friday 19 April 2019
Last updated 16:33 Friday 29 March 2019 : Expect delays.
Works | Utility
[A2216] Lordship Lane (SE22) (All Directions) at the junction of North Cross Road - Temporary signals in place for Thames Water works.
From: Monday 25 March 2019
To: Monday 08 April 2019
Last updated 16:34 Friday 29 March 2019 : Expect delays.
Works | Utility
[A2212] Baring Road (SE12) (All Directions) at the junction of Heather Road - There are UKPN works at this location with temporary signals in place.
From: Friday 22 March 2019
To: Tuesday 02 April 2019
Last updated 06:27 Saturday 30 March 2019 : Traffic is flowing well.
Works | Borough
[A400] Fortess Road (All Directions) at the junction of Highgate Road - Temporary traffic signals in place to facilitate Volker Highways works.
From: Friday 22 March 2019
To: Thursday 11 April 2019
Last updated 02:51 Saturday 30 March 2019 : Traffic is flowing well.
Works | Borough
[A400] Tottenham Court Road (W1T) (Northbound) between Great Russell Street and Stephen Street - Lanes two and three (of three) are closed for works.
From: Friday 15 March 2019
To: Ongoing
Last updated 16:54 Friday 29 March 2019 : Expect delays.
Works | Other
[A205] Plassy Road (Southbound) at the junction of Brownhill Road - Lane one (of two) is restricted various times of the day due to building works.
From: Friday 08 September 2017
To: Friday 06 September 2019
Last updated 15:39 Friday 29 March 2019 : Expect delays.
Works | Other
[A41] Finchley Road (NW3) (Northbound) at the junction of Lithos Road - Intermittent lane restrictions for loading and unloading during building works.
From: Thursday 28 February 2019
To: Sunday 31 March 2019
Last updated 15:45 Friday 29 March 2019 : Delays are possible.
Works | Utility
[A41] Baker Street (NW1/W1U) (Southbound) at the junction of Marylebone Road - The footpath is partially restricted due to Thames Water works.