Works | TfL
[A2204] Woolwich Ferry (Both Directions) - Closed to facilitate ferry upgrade works.
From: Saturday 06 October 2018
To: Sunday 02 December 2018
Last updated 11:44 Thursday 22 November 2018 : Use an alternative route.
Works | TfL
[A117] Pier Road (Westbound) between Albert Road and Store Road - Road closed to facilitate cycle and pedestrian upgrade works. Works include kerb adjustment, footway reconstruction, new parking bays, new road markings, CCTV, lamp column and gantry works.
From: Monday 12 November 2018
To: Sunday 09 December 2018
Last updated 08:41 Thursday 22 November 2018 : Use an alternative route. Delays possible.
Works | Utility
Leadenhall Street (EC3V/EC3A) (Westbound) between Whittington Avenue and Gracechurch Street - Road is closed during utility works.
From: Monday 05 January 2015
To: Saturday 31 July 2021
Last updated 08:14 Thursday 22 November 2018 : Use an alternative route. Delays are possible.
Works | TfL
[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed. Find out more about Bank and Monument works
From: Monday 22 July 2013
To: Monday 31 December 2018
Last updated 08:33 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A201] Farringdon Road (All Directions) between Cowcross Street and Charterhouse Street - Cowcross Street is closed for Crossrail works. Minor restrictions on Farringdon Road both ways. Find out more about Crossrail works
From: Sunday 04 November 2018
To: Monday 21 January 2019
Last updated 08:05 Thursday 22 November 2018 : Use an alternative route.
Special and Planned Events | Other
North Carriage Drive (W2) (All Directions) - Road closed from 0600hrs on 4th November until 26th November to facilitate build for an event. It will then remain closed eastbound until the 0600hrs on 4th January when it will be fully closed again until 2359hrs on 21st January.
From: Thursday 11 January 2018
To: Monday 01 July 2019
Last updated 07:21 Thursday 22 November 2018 : Use an alternative route.
Works | Borough
Park Crescent (NW1/W1G/W1B) (Southbound) at the junction of [A501] Marylebone Road - Closed due to works by Westminster City Council.
From: Tuesday 14 August 2018
To: Friday 30 November 2018
Last updated 08:01 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A206] Plumstead Road at the junction of Beresford Street - The left turn from Woolwich New Road to Beresford Street will be permanently prohibited. Until 21/12/2018 there will be temporary signals in use at the junction of Woolwich New Road and Plumstead Road.
From: Monday 12 November 2018
To: Friday 14 December 2018
Last updated 15:16 Thursday 22 November 2018 : Moderate delays on approaches to Westminster Bridge from York Road, Lambeth Palace Road and Westminster Bridge Road.
Works | Borough
[A302] Bridge Street (SW1A) (Both Directions) between Parliament Square and Victoria Embankment - Road closed for security installation. Westminster Bridge will also be fully closed westbound (except buses and licensed taxis). More information on the Westminster City website.
From: Wednesday 21 November 2018
To: Ongoing
Last updated 14:00 Thursday 22 November 2018 : Delays are possible.
Hazard(s) | Burst Water Main
[A307] Clarence Street (Northbound) at the junction of Wheatfield Way - Closed to facilitate emergency Thames Water repairs to a burst water main.
From: Tuesday 20 November 2018
To: Monday 26 November 2018
Last updated 07:52 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A1010] High Road (N17) (Southbound) at the junction of Dowsett Road - Lane one is closed to facilitate emergency Cadent Gas works. Dowsett Road is also closed.
From: Thursday 22 November 2018
To: Wednesday 28 November 2018
Last updated 16:30 Thursday 22 November 2018 : Traffic is slow moving on approach. Expect delays.
Hazard(s) | Burst Water Main
[A2213] Kidbrooke Park Road (SE3/SE12) (Southbound) at the junction of Weigall Road - Road is closed between Weigall Road and Cambert Way due to a burst water main.
From: Monday 12 November 2018
To: Friday 07 December 2018
Last updated 08:00 Thursday 22 November 2018 : Delays are possible.
Works | TfL
[A3220] Battersea Bridge Road (SW11) (All Directions) between Cambridge Road and Battersea Park Road - Various footway and carriageway restrictions to facilitate a major Highway upgrade scheme. From 12/11/2018 until 30/11/2018, Kersley Street will be fully closed at the junction with Battersea Bridge Road (a signed local diversion will be in place). From 03/12/2018 until 05/12/2018, Battersea Bridge Road will be closed southbound between Cambridge Road and Battersea Park Road (with a signed diversion in place).
From: Friday 12 October 2018
To: Friday 30 November 2018
Last updated 08:01 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A23] Brixton Road (SW9) (Both Directions) at the junction of Cranmer Road - The carriageway is restricted due to gas works. Additionally Cranmer Road is closed.
From: Thursday 22 November 2018
To: Thursday 29 November 2018
Last updated 13:59 Thursday 22 November 2018 : Use other routes.
Works | Utility
[B353] Manor Road (All Directions) between Lower Richmond Road and Sheen Road - The road is closed due to gas works.
From: Wednesday 10 October 2018
To: Monday 31 December 2018
Last updated 11:44 Thursday 22 November 2018 : Use an alternative route.
Works | Utility
[A117] Pier Road (Westbound) between Albert Road and Woolwich Ferry Pier - Full carriageway closure to facilitate collaborative utility works. Traffic Management will be in place 24/7.
From: Wednesday 10 October 2018
To: Sunday 16 December 2018
Last updated 07:31 Thursday 22 November 2018 : Use an alternative route. Delays Possible.
Works | Emergency
Cannon Street (EC4N/EC4M/EC4R) (All Directions) at the junction of Walbrook/Dowgate Hill - Cannon Street is closed between King William Street and Queen Victoria Street with continued associated restrictions until the completion of these works.
From: Wednesday 04 January 2017
To: Saturday 31 December 2022
Last updated 08:32 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A3211] Victoria Embankment (EC4) (Both Directions) between [A201] Blackfriars Bridge and Horse Guards Avenue - Various carriageway restrictions have been implemented for the Tideway works. A diversion is in place for traffic wishing to access [A3211] Victoria Embankment westbound. Northbound traffic on [A201] Blackfriars Road is diverted via [A3200] Stamford Street, [A301] Waterloo Bridge, [A4] Strand, Arundel Street and Temple Place. Southbound traffic on [A201] New Bridge Street is diverted via [A4] Fleet Street, [A4] Strand, Arundel Street and Temple Place. The Cycle Superhighway has a new layout. In addition, the northern slip ramp will be closed over two nights between 1900hrs and 0500hrs each night from Saturday 24 November until Monday 26 November.Find out more about the road changes at Victoria Embankment
From: Sunday 18 November 2018
To: Sunday 25 November 2018
Last updated 07:43 Thursday 22 November 2018 : Delays are possible.
Special and Planned Events | Construction Activity
Culross Street (W1K) (Both Directions) between Park Street and Park Lane - The road is closed due to a crane operation.
From: Thursday 22 November 2018
To: Friday 23 November 2018
Last updated 14:00 Thursday 22 November 2018 : Delays are expected.
Works | Borough
[A2216] Lordship Lane (SE22) (Both Directions) between Goodrich Road and Landells Road - Road closure due to road works on behalf of Southwark Council. Daily.
From: Monday 08 October 2018
To: Sunday 10 March 2019
Last updated 07:49 Thursday 22 November 2018 : Delays are possible.
Works | Borough
St Mary Axe (EC3A) (All Directions) between Bevis Marks and Houndsditch - Various restrictions in place over a number of phases for junction realignment works. Phase 2A: 22 October to 27 January 2019 St Mary Axe is closed between Bevis Marks and Houndsditch.
From: Monday 01 October 2018
To: Wednesday 28 November 2018
Last updated 08:03 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A2211] Greenwich South Street (SE10) (Southbound) at the junction of Blissett Street - Road is closed due to gas works.
From: Wednesday 19 September 2018
To: Monday 25 February 2019
Last updated 07:18 Thursday 22 November 2018 : Use an alternative route. Delays possible.
Works | Utility
[B134] Osborn Street (E1) (Northbound) - Road fully closed for UKPN works. The Cycle Super Highway is also closed at this location.
From: Sunday 16 September 2018
To: Saturday 08 December 2018
Last updated 08:36 Thursday 22 November 2018 : Use an alternative route.
Works | Borough
Great Scotland Yard (SW1A) (Eastbound) between Whitehall and Scotland Place - The road is closed for work by Westminster Council.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:17 Thursday 22 November 2018 : Use alternative route.
Special and Planned Events | Other
[A305] George Street (Eastbound) between King Street and Duke Street - The road is closed to facilitate Christmas light switch on.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:23 Thursday 22 November 2018 : Traffic remains slow moving eastbound on the A12, with tailbacks to the East Cross Route beyond Old Ford towards Bow Underpass. Expect very long delays.
Traffic Incidents | Collision
[A12] East Cross Route (E11/E10) (Eastbound) beneath [B161] Cathall Road - Lane one (of three) remains closed following an earlier road traffic collision.
From: Sunday 13 March 2016
To: Sunday 31 March 2019
Last updated 15:58 Thursday 22 November 2018 : Traffic is slow moving in both directions through restrictions. Expect delays.
Works | TfL
Ardleigh Green Bridge, [A127] Southend Arterial Road (RM2) (Both Directions) at the junction of Bryant Avenue - Various restrictions and a contra-flow in operation during bridge replacement works. Find out more about the Ardleigh Green bridge replacement.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:22 Thursday 22 November 2018 : Traffic remains slow-moving along the A2 eastbound. Queues currently back towards Sun in the Sands. Expect delays.
Traffic Incidents | Collision
[A2] East Rochester Way (DA5) (Eastbound) after the junction of [A221] Danson Road (Danson Interchange) - All lanes reopened following earlier collision.
From: Tuesday 20 November 2018
To: Tuesday 27 November 2018
Last updated 16:29 Thursday 22 November 2018 : Traffic is slow moving on the approach to the temporary traffic signals. Southbound traffic on Roehampton Lane is tailing back towards Upper Richmond Road. Expect delays.
Hazard(s) | Burst Water Main
[A306] Roehampton Lane (SW15) (All Directions) at the junction of Holford Way - Three way temporary traffic lights will be in operation to facilitate Thames Water mains repair works.
From: Monday 19 November 2018
To: Sunday 02 December 2018
Last updated 16:15 Thursday 22 November 2018 : Traffic is slow on approach. Expect delays.
Works | Other
[A40] High Holborn (Both Directions) at the junction of Bloomsbury Street - Lane closures in place to enable works at the Shaftesbury Theatre.
From: Sunday 04 November 2018
To: Ongoing
Last updated 14:57 Thursday 22 November 2018 : Traffic is flowing well..
Infrastructure Issue | Signal Timing
[A1] Apex Corner (Mill Hill) (All Directions) - The traffic signal timing is faulty.
From: Friday 08 June 2018
To: Monday 11 November 2019
Last updated 08:03 Thursday 22 November 2018 : Delays are possible.
Works | TfL
Highbury Corner Roundabout, Highbury Corner (N1) (All Directions) - Various lane closures in place to facilitate gyratory scheme works. More information.
From: Friday 16 November 2018
To: Thursday 22 November 2018
Last updated 16:04 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A10] Great Cambridge Road (EN1) (Northbound) at the junction of Hoe Lane - Lane one ( of two) is closed to facilitate UKPN repair works.
From: Tuesday 06 November 2018
To: Friday 30 November 2018
Last updated 16:27 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A10] High Road (N15) (Northbound) between St Ann's Road and Seven Sisters Road - Bus lane closed to facilitate emergency Thames Water works.
From: Monday 05 November 2018
To: Friday 23 November 2018
Last updated 11:53 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A13] Commercial Road (E14) (Westbound) at the junction of West India Dock Road - Lane 2 (of 2) is closed westbound on Commercial Road due to utility works.
From: Wednesday 17 October 2018
To: Friday 21 December 2018
Last updated 11:44 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A11] Whitechapel Road (E1) (Both Directions) at the junction of East Mount Street - Temporary signals in operation 2000hrs-0500hrs to facilitate Crossrail works. Footway works 0800hrs-1700hrs. Eastbound bus lane closed 24 hours a day. Westbound lane closures 2000hrs-0500hrs.
From: Wednesday 14 November 2018
To: Thursday 22 November 2018
Last updated 11:54 Thursday 22 November 2018 : Delays are possible.
Works | Emergency
[A13] Commercial Road (E14) (Westbound) between West India Dock Road and Newell Street. - Lane one (of two) is closed due to emergency gas works.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 14:03 Thursday 22 November 2018 : Traffic is flowing well. Use caution through contraflow system.
Works | Emergency
[A23] Brixton Hill (SW2) (Both Directions) at the junction of Dumbarton Road - A contraflow in operation for emergency water repairs.
Provisional dates:
From: Monday 01 January 2018
To: Wednesday 01 January 2020
Last updated 12:53 Wednesday 21 November 2018
Works | TfL Works
Gyrathory changes to two way flows
From: Thursday 01 November 2018
To: Friday 23 November 2018
Last updated 14:37 Thursday 22 November 2018 : Traffic is flowing well.
Works | TfL
[A316] Apex Corner Flyover (TW13) (Both Directions) at the junction of [A312] Hampton Road West (Apex Corner), Hanworth - A 30MPH speed limit has been implemented whilst the works continue.
Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021
Last updated 12:53 Wednesday 21 November 2018
Works | TfL Works
Twickenham Bridge, Bridge Concrete repairs and waterproofing.
From: Monday 08 October 2018
To: Saturday 15 December 2018
Last updated 14:37 Thursday 22 November 2018 : Traffic is flowing well.
Works | Other
[A4] Great West Road (Both Directions) between Clayponds Avenue and Ealing Road - Lane 3 closed to facilitate Highways England works to the elevated M4. In addition, the A4 will be fully closed overnight between 2200hrs and 0500hrs Monday to Friday.
From: Monday 29 May 2017
To: Monday 30 November 2020
Last updated 08:26 Thursday 22 November 2018 : Delays are possible.
Works | TfL
[A4] Brompton Road (SW3) (Westbound) after the junction of [A4] Knightsbridge (Scotch Corner) - Lane one (of three) closed until late 2020 during station upgrade works.
From: Saturday 28 May 2016
To: Monday 31 December 2018
Last updated 16:28 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A306] Hammersmith Bridge (W6) (Both Directions) - New weight limit imposed on Hammersmith Bridge. Only one bus is allowed to cross the bridge at a time due to safety reasons until the bridge is fully refurbished. Pedestrian access is maintained throughout. More information on the London Borough of Hammersmith & Fulham's website.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:15 Thursday 22 November 2018 : Traffic is passing with minimal delays.
Traffic Incidents | Breakdown
[A4] West Cromwell Road (SW5) (Westbound) between Earls Court Road and Warwick Road - Lane one of three is blocked by a broken down van.
From: Monday 20 June 2016
To: Friday 19 April 2019
Last updated 16:41 Thursday 22 November 2018 : Delays are possible.
Works | TfL
Power Road Bridge, [A406] Gunnersbury Avenue (North Circular Road) (W4) (Both Directions) at the junction of Power Road - Various restrictions during bridge replacement works. The carriageway has been reduced to one lane northbound until 22nd November when two lanes will operate in both directions under a new temporary road layout. More information on the Power Road Bridge project.
Provisional dates:
From: Friday 01 September 2017
To: Friday 31 December 2021
Last updated 12:53 Wednesday 21 November 2018
Works | TfL Works
CS11 and Brent Cross Cricklewood Regeneration
From: Monday 24 July 2017
To: Friday 01 February 2019
Last updated 07:28 Thursday 22 November 2018 : Delays possible.
Works | Borough
Baker Street two-way scheme, [A41] Baker Street and Gloucester Place (All Directions) between [A41] Park Road and [A41] Portman Square - Carriageway restrictions and temporary traffic signals will operate for the conversion of [A41] Baker Street and [A41] Gloucester Place to two-way traffic until early 2019. Parking, bus lane and access suspension will be implemented at various times. Baker Street is reduced to two lanes (from three) southbound at the junction of Blandford Street. Various restrictions in place at Park Road junction with Gloucester Place. Further details of the scheme.
From: Saturday 29 August 2015
To: Sunday 04 August 2019
Last updated 07:13 Thursday 22 November 2018 : Expect delays.
Works | TfL
[A3] King William Street (EC3R/EC4R) (northbound) between London Bridge and Arthur Street - Lane one is closed from London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website
From: Tuesday 20 November 2018
To: Sunday 16 December 2018
Last updated 08:02 Thursday 22 November 2018 : Delays are possible
Works | Utility
[A201] King's Cross Road (Southbound) between Lorenzo Street and Great Percy Street The carriageway is restricted for electrical work.
From: Monday 05 March 2018
To: Tuesday 31 March 2020
Last updated 08:16 Thursday 22 November 2018 : Delays are possible.
Works | Other
The West End Project, [A400] Tottenham Court Road (W1T) (Northbound) between Oxford Street and Euston Road - Various lane closures and temporary signals in place due to "The West End Project". More information on Camden council's website. Tuesday 20 November, between approximately 2200hrs and 0500hrs, reduced to one lane at the junction of Torrington Place.
From: Monday 19 November 2018
To: Sunday 25 November 2018
Last updated 07:07 Thursday 22 November 2018 : Expect delays when restrictions apply.
Works | Utility
[A200] Crucifix Lane (SE1) (Eastbound) at the junction of Bermondsey Street - Lane width restrictions in use to facilitate UKPN works.
From: Monday 23 July 2018
To: Wednesday 20 July 2022
Last updated 08:22 Thursday 22 November 2018 : Delays are possible.
Works | Utility
Tideway Tunnel Project, [A3212] Chelsea Embankment (SW11/SW3) (Both Directions) between Embankment Gardens and Chelsea Bridge - Various lane restrictions in place to facilitate Tideway Tunnel Project works. A new road layout will be installed that will remain throughout the duration of the works. More information on the Thames Tideway website.
From: Monday 13 November 2017
To: Saturday 24 November 2018
Last updated 07:51 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A400] Hampstead Road (NW1) (Both Directions) at the junction of Cardington Street - The footway is closed southbound with width restrictions northbound until 24th November for HS2 work. More information on the HS2 website.
From: Monday 12 November 2018
To: Friday 30 November 2018
Last updated 08:00 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A1010] High Road (N17) (All Directions) at the junction of Park Lane - Temporary traffic signals are in place to facilitate works.
From: Monday 24 September 2018
To: Friday 30 November 2018
Last updated 16:40 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A5] The Hyde (Both Directions) between Wakemans Hill Avenue and Windover Avenue - Temporary signals in operation to facilitate works by UKPN.
From: Tuesday 04 September 2018
To: Friday 14 December 2018
Last updated 08:24 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A40] Oxford Street (W1K/W1C) (All Directions) at the junction of Portman Street - Temporary signals in operation to facilitate works.
From: Monday 18 September 2017
To: Tuesday 30 April 2019
Last updated 11:42 Thursday 22 November 2018 : Delays are possible.
Works | Borough
STRATFORD One-Way-System (All Directions) - The joint scheme by Newham Council and TfL to convert the one-way system has been fully implemented and a two way system is now in operation. More information.
From: Tuesday 20 November 2018
To: Sunday 25 November 2018
Last updated 14:49 Thursday 22 November 2018 : Traffic is flowing well.
Works | Utility
[A503] Ferry Lane (N17) (Both Directions) at the junction of Bream Close - Two way temporary traffic signals are in operation to facilitate Virgin Media works.
From: Tuesday 20 November 2018
To: Ongoing
Last updated 15:15 Thursday 22 November 2018 : Minor delays on approach at this time.
Works | Borough
[A40] High Holborn (WC1V/WC1A) (Westbound) at the junction of Museum Street - Lane closures in place due to emergency works.
From: Wednesday 21 November 2018
To: Ongoing
Last updated 15:27 Thursday 22 November 2018 : Traffic is flowing well.
Works | Other
[A312] The Parkway (UB3) (Both Directions) at the junction of Pump Lane - The carriageway has been reduced to one lane both ways and temporary signals are operating for construction works.
From: Wednesday 21 November 2018
To: Sunday 25 November 2018
Last updated 10:44 Thursday 22 November 2018 : Use another route.
Hazard(s) | Burst Water Main
Wickham Court Road (BR4) (Both Directions) between High Street and Woodland Way - The road is closed due to a burst water main.
From: Monday 22 January 2018
To: Wednesday 12 June 2019
Last updated 07:34 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A307] Wheatfield Way (All Directions) at the junction of College Roundabout (Kingston) - Various lane closures and restrictions between College Roundabout and Orchard Road for the 'Mini-Holland' scheme.
Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021
Last updated 12:53 Wednesday 21 November 2018
Works | TfL Works
Vauxhall Bridge, Bridg - Repainting and waterproofing
From: Thursday 05 October 2017
To: Sunday 31 March 2019
Last updated 11:42 Thursday 22 November 2018 : Delays possible.
Works | Borough
[A104] Whipps Cross Roundabout (All Directions) - Various restrictions and temporary signals in place as part of a carriageway widening and resurfacing scheme for Waltham Forest Borough Council.
From: Monday 30 April 2018
To: Friday 31 May 2019
Last updated 07:59 Thursday 22 November 2018 : Delays are possible.
Special and Planned Events | Construction Activity
[A40] Oxford Street (W1) (Both Directions) between [A400] Tottenham Court Road (St Giles Circus) and Rathbone Place - Reduced to a single lane in both directions due to a new development. There is also a northbound restriction on Earnshaw Street approaching New Oxford Street.
Provisional dates:
From: Monday 01 January 2018
To: Saturday 01 December 2018
Last updated 12:53 Wednesday 21 November 2018
Works | TfL Works
Better Junctions
From: Tuesday 16 October 2018
To: Friday 23 November 2018
Last updated 07:54 Thursday 22 November 2018 : Delays are possible.
Works | TfL
[A1010] High Road Tottenham (N17) (All Directions) at the junction of White Hart Lane - Temporary signals in operation to facilitate traffic signal upgrade works.
From: Monday 18 June 2018
To: Friday 29 March 2019
Last updated 07:36 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A2212] Baring Road (SE12) (All Directions) between Downham Way and Chinbrook Road - Carriageway restrictions and temporary signals controlling single alternate lane traffic are in place due to public realm redevelopment works.
From: Sunday 07 October 2018
To: Friday 07 December 2018
Last updated 16:29 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A219] Wood Lane (W12) (All Directions) at the junction of Ariel Way - Temporary signals are operating for works.
From: Tuesday 25 September 2018
To: Friday 01 March 2019
Last updated 16:29 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A5200] York Way (N1/N1C) (Both Directions) at the junction of Freight Lane - Temporary traffic lights in operation to facilitate works.
From: Wednesday 19 September 2018
To: Friday 23 November 2018
Last updated 10:45 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A215] Walworth Road (SE17) (Southbound) between Wansey Street and Heygate Street - Bus lane closed to facilitate works that are part of the Elephant Park development.
From: Monday 01 October 2018
To: Sunday 01 March 2020
Last updated 07:31 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A308] Kingston Vale (SW15) (Both Directions) at the junction of Robinwood Place - There are various lane closures and temporary traffic lights in operation due to works for the Go Cycle/Mini Holland cycle lane scheme.
From: Tuesday 11 September 2018
To: Friday 14 December 2018
Last updated 07:34 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A300] Southwark Bridge Road (Southbound) at the junction of Park Street - The carriageway has been reduced to one lane in both directions for bridge work.
From: Tuesday 29 May 2018
To: Sunday 31 March 2019
Last updated 08:05 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A244] Hounslow Road (TW14/TW13) (Both Directions) between New Road and [B3377] Hanworth Road - Single alternate lane traffic with temporary traffic signals in operation for collaborative works on behalf of Network Rail and Hounslow council. More information on Hounslow's website.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:33 Thursday 22 November 2018 : Traffic is slow moving on approach.
Traffic Incidents | Collision
[A13] Thames Gateway (Wennington) (Westbound) - Lanes one (of three) are blocked due to a collision.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:22 Thursday 22 November 2018 : Traffic is slowing moving. Expect delays.
Traffic Incidents | Collision
[A4127] Greenford Road (UB6) (All Directions) at the junction of Ruislip Road East - A collision blocking the junction
From: Monday 19 November 2018
To: Thursday 22 November 2018
Last updated 14:35 Thursday 22 November 2018 : Traffic is flowing well.
Works | Utility
[A1] Holloway Road (N7) (All Directions) at the junction of Hornsey Street - Temporary traffic signals are in operation to facilitate Thames Water connection works.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:03 Thursday 22 November 2018 : Traffic flow is normal for time of day.
Hazard(s) | Collapsed Manhole
[A1] Holloway Road (N19) (Northbound) approaching the junction of [A400] St John's Grove outside Upper Holloway station - Reports of a collapsed manhole.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 11:54 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A13] Commercial Road (E1) (Eastbound) between Deancross Street and Jubilee Street - Lane one closed to facilitate Cadent Gas works.
From: Tuesday 16 October 2018
To: Friday 07 December 2018
Last updated 08:00 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A215] Denmark Hill (Northbound) at the junction of Camberwell New Road - Lane restrictions in place to facilitate footway works.
From: Saturday 13 October 2018
To: Thursday 31 October 2019
Last updated 07:31 Thursday 22 November 2018 : Delays are possible.
Special and Planned Events | Construction Activity
[B210] Artillery Place (Both Directions) at the junction of Belford Grove - Two way temporary traffic signals in operation to facilitate road works. (Continuous)
From: Monday 12 March 2018
To: Sunday 05 January 2020
Last updated 07:31 Thursday 22 November 2018 : Delays are possible.
Works | TfL
[A3] North Side Wandsworth Common (SW18) (Westbound) at the junction of Huguenot Place and Woodwell Street - Lane four (of four) is closed for road works and crane operations. Lane one (of two) on Woodwell Street is closed between North Side Wandsworth Common and East Hill.
From: Tuesday 01 August 2017
To: Saturday 02 March 2019
Last updated 07:41 Thursday 22 November 2018 : Delays are possible.
Special and Planned Events | Construction Activity
[A205] Upper Richmond Road (SW15) (Westbound) at the junction of Carlton Drive - Carriageway restrictions for deliveries between the following times: Mon-Fri 10am to 4pm & Sat 9am to 1pm.
From: Tuesday 04 September 2018
To: Wednesday 28 November 2018
Last updated 08:03 Thursday 22 November 2018 : Delays are possible.
Works | TfL
[A21] Masons Hill (BR2) (All Directions) at the junction of [B265] Holmesdale Road - Various lane restrictions between approximately 0930hrs and 1600hrs each day and road closures between approximately 2000hrs and 0500hrs each night during junction improvement works. Temporary signals are in use 24/7.
From: Monday 19 November 2018
To: Ongoing
Last updated 14:04 Thursday 22 November 2018 : Traffic is flowing well. Approach with caution.
Hazard(s) | Burst Water Main
[A21] Lewisham High Street (SE13) (Southbound) at the junction of Lewisham Park - Lane one (bus lane) is partially blocked due to a burst water main..
From: Thursday 03 August 2017
To: Thursday 26 September 2019
Last updated 08:28 Thursday 22 November 2018 : Delays are possible.
Works | TfL
[A23] Kennington Road (SE11) (Northbound) at the junction of Clayton Street - The road has been reduced to one lane in both directions for London Underground upgrade works.
From: Wednesday 21 November 2018
To: Wednesday 28 November 2018
Last updated 08:02 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A297] St Helier Avenue (SM4) (Southbound) between and Rose Hill Roundabout - Lane one is closed to facilitate connection works.
From: Friday 16 November 2018
To: Thursday 22 November 2018
Last updated 10:49 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A24] High Street Collier's Wood (SW19) (Northbound) between College Road and University Road - Cycle superhighway restricted to facilitate footway works.
From: Thursday 22 November 2018
To: Monday 26 November 2018
Last updated 14:04 Thursday 22 November 2018 : No restrictions in place. Traffic is flowing well.
Works | TfL
[A3] Clapham Road (SW9/SW4) (Northbound) at the junction of Jeffrey's Road - Lane closure in place to facilitate telecommunications works by TfL.
From: Thursday 06 September 2018
To: Monday 30 September 2019
Last updated 07:34 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A24] Balham High Road (SW17) (Northbound) at the junction of Upper Tooting Park - Lane one is closed to facilitate works. There are also minor restrictions in place northbound.
From: Tuesday 05 June 2018
To: Monday 01 April 2019
Last updated 07:36 Thursday 22 November 2018 : Delays are possible.
Works | Other
Prince Of Wales Drive (SW8) (Both Directions) between Battersea Park Road and Queenstown Road - Pavement closures implemented when necessary due to construction work. Possible carriageway restrictions to maintain pedestrian access at times.
From: Thursday 22 November 2018
To: Tuesday 27 November 2018
Last updated 16:42 Thursday 22 November 2018 : Traffic is flowing well.
Works | Utility
[A3205] Battersea Park Road (SW11) (Eastbound) at the junction of St James's Grove - Restrictions in place due to urgent gas repairs.
From: Monday 30 April 2018
To: Wednesday 19 December 2018
Last updated 07:42 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A3205] Nine Elms Lane (Both Directions) near the junction of Ponton Road - Temporary traffic signals are in operation due to Thames Tideway works.
From: Wednesday 21 November 2018
To: Friday 23 November 2018
Last updated 10:45 Thursday 22 November 2018 : Delays are possible.
Works | Utility
Tolworth Rise South (KT5) (All Directions) at the junction of Oakdene Drive - Three way temporary traffic signals are in place to facilitate BT works.
From: Wednesday 07 November 2018
To: Wednesday 05 December 2018
Last updated 08:00 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A3205] Nine Elms Lane (SW11) (Eastbound) opposite Riverlight Quay - Lane 1 (bus lane) closed to facilitate Thames Water works.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 08:09 Thursday 22 November 2018 : Delays are possible
Works | Utility
[A3036] Wandsworth Road (Vauxhall Cross) (Northbound) between Parry Street and Bridgefoot - Bus lane closure in place during Thames Water works.
From: Monday 19 November 2018
To: Monday 26 November 2018
Last updated 10:42 Thursday 22 November 2018 : Delays are possible
Works | Utility
[A3205] York Road (SW11) (All Directions) at the junction of Battersea High Street - Lane and bus stop suspension are in place during gas connection works.
From: Wednesday 14 November 2018
To: Friday 23 November 2018
Last updated 10:44 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A3205] Nine Elms Lane (SW11/SW8) (Eastbound) at the junction of Ponton Road - Lane one closed to facilitate Thames Water works.
From: Tuesday 03 May 2016
To: Tuesday 30 April 2019
Last updated 07:10 Thursday 22 November 2018 : Expect delays.
Works | Borough
[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - The carriageway will be restricted at various times until April 2019 for the redevelopment of 55-91 Knightsbridge. The westbound bus lane is closed until April 2019. Additionally, the bus lane is closed from Old Barrack Yard to William Street until 30/09/19 during the redevelopment of the Berkeley Hotel. More information available on Westminster council's website.
From: Monday 05 November 2018
To: Saturday 01 December 2018
Last updated 08:27 Thursday 22 November 2018 : Expect delays when restrictions are in place.
Works | Other
Hatton Road (TW6/TW14) (All Directions) at the junction of Great South-west Road - Lane closures to facilitate resurfacing works are scheduled to take place between 2230 and 0430 hours.
From: Monday 30 July 2018
To: Monday 31 December 2018
Last updated 08:20 Thursday 22 November 2018 : Delays are possible.
Works | Borough
BAYSWATER AREA (W2), Cycle Quietway Scheme - Various road closures during cycle installation scheme works. Roads affected include [B415] Sussex Gardens and Norfolk Crescent. [B410] Craven Road and Craven Hill Gardens. [A4207] Chepstow Road, [A4209] Sussex Gardens, [B411] Inverness Terrace. [B415] Craven Terrace, Inverness Terrace, Moscow Road, Norfolk Crescent, Porchester Gardens and Talbot Road.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:46 Thursday 22 November 2018 : Approach with caution. Traffic is flowing well.
Traffic Incidents | Collision
[A406] Mill House Roundabout, Ilford (A406 / A118) (Southbound) at the junction of Ilford Flyover (A406) - Lane restricted on the southbound entry slip to the A406 due to a collision.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 14:09 Thursday 22 November 2018 : Traffic is slow on approach. Expect delays.
Works | Utility
[A5] Edgware Road (W2) (Northbound) at the junction of Church Street - Lane one (of two) closed to facilitate gas works.
From: Sunday 18 November 2018
To: Friday 23 November 2018
Last updated 13:51 Thursday 22 November 2018 : Approach with caution. Traffic is flowing well.
Hazard(s) | Burst Water Main
[A41] Gloucester Place (NW1) (Northbound) at the junction of Ivor Place - Surface water due to a burst water main.
From: Saturday 10 November 2018
To: Friday 23 November 2018
Last updated 16:28 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[B511] College Crescent (NW3) (All Directions) at the junction of Buckland Crescent - Lane restrictions are in place during repairs to damaged telecommunication connections by UKPN.
From: Thursday 15 November 2018
To: Saturday 24 November 2018
Last updated 07:56 Thursday 22 November 2018 : Delays are possible
Works | Utility
[A10] Gracechurch Street (EC3V) (Southbound) at the junction of Bell Inn Yard - Lane restriction in place to facilitate works by Cadent Gas.
From: Thursday 22 November 2018
To: Ongoing
Last updated 13:39 Thursday 22 November 2018 : Traffic is flowing well.
Special and Planned Events | Demonstration
[A302] Parliament Square/Old palace Yard (All Directions) - A group will form up at these locations for a demonstration.
From: Thursday 22 November 2018
To: Wednesday 28 November 2018
Last updated 15:45 Thursday 22 November 2018 : Traffic is flowing well.
Works | Utility
[A1203] The Highway (E1W) (Westbound) at the junction of Artichoke Hill - Lane one closure due to emergency gas leak repairs.
From: Thursday 22 November 2018
To: Ongoing
Last updated 16:02 Thursday 22 November 2018 : The tunnel currently remains open.
Hazard(s) | Other
[A301] Strand Underpass (Northbound) - The underpass will be closed to facilitate emergency repairs.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 06:53 Thursday 22 November 2018 : Cyclists should approach with caution.
Works | Utility
[A201] Blackfriars Road (SE1) (Southbound) at the junction of Union Street - The footway is restricted due to emergency UKPN works.
From: Saturday 17 November 2018
To: Friday 30 November 2018
Last updated 08:03 Thursday 22 November 2018 : Expect delays.
Works | Borough
[A501] Euston Road (NW1) (Both Directions) at the junction of Midland Road and Judd Street - Various restrictions for cycle works.
From: Thursday 22 November 2018
To: Ongoing
Last updated 14:53 Thursday 22 November 2018 : Approach with caution.
Infrastructure Issue | Traffic Signal
[A501] Euston Road (NW1) (All Directions) at the junction of Bus Station exit - Traffic signals are all out.
From: Thursday 08 November 2018
To: Saturday 24 November 2018
Last updated 11:38 Thursday 22 November 2018 : Delays possible.
Works | Utility
[A202] South Lambeth Road (SW8) (Southbound) between Vauxhall Grove and Parry Street - Various lane closures are scheduled to enable works by Power On Connections.
From: Monday 17 September 2018
To: Sunday 17 March 2019
Last updated 11:42 Thursday 22 November 2018 : Delays are possible.
Infrastructure Issue | Other
[A101] Rotherhithe Tunnel (Both Directions) - Increased restrictions in place for goods vehicles. The maximum vehicle height has been set at 2m, with a weight limit of 2 tonnes during essential ventilation system works. This has reduced the northbound entry to one lane (from two). More information.
From: Monday 25 June 2018
To: Monday 13 April 2020
Last updated 07:37 Thursday 22 November 2018 : Delays possible during the ongoing works.
Special and Planned Events | Construction Activity
[A3212] Millbank Roundabout (SW1) (All Directions) junction with [B323] Horseferry Road and Lambeth Bridge - The carriageway is restricted for construction work. In addition, on the following Sundays of 18th November, 25th November and 2nd December, Millbank will be closed in both directions between Lambeth Bridge and Thorney Street from 05:00 to 14:00 each day.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 16:30 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A5109] Deansbrook Road (HA8) (All Directions) at the junction of Heming Road - Lane restrictions in place during gas connection works by Cadent Gas.
From: Thursday 22 November 2018
To: Ongoing
Last updated 15:14 Thursday 22 November 2018 : Approach with caution. Traffic is flowing well.
Infrastructure Issue | Traffic Signal
[A107] Cambridge Heath Road (E2) (Southbound) at the junction of Bishop's Way - Traffic signal head for the southbound traffic has been knocked out of alignment.
From: Thursday 22 November 2018
To: Friday 23 November 2018
Last updated 14:00 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A232] Croydon Road (SM6) (Westbound) at the junction of Guy Road - Lane width restrictions in use to facilitate BT works (daily, 0800hrs to 1630hrs).
From: Monday 19 November 2018
To: Saturday 23 February 2019
Last updated 07:51 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A1010] Hertford Road (N9) (All Directions) at the junction of Bounces Road - Temporary traffic signals in operation to facilitate a cycling scheme. In addition, Bury Street and Rosemary Avenue are closed.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 08:28 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A407] Chichele Road (NW2) (All Directions) at the junction of Anson Road - Temporary traffic signals in operation to facilitate Thames Water works.
From: Tuesday 20 November 2018
To: Thursday 22 November 2018
Last updated 10:49 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[B215] Peckham Hill Street (SE15) (Northbound) at the junction of Goldsmith Road - Lane restriction to facilitate borough works
From: Friday 09 November 2018
To: Thursday 22 November 2018
Last updated 06:41 Thursday 22 November 2018 : Delays possible.
Works | Other
Hinde Street (W1U) (All Directions) at the junction of Thayer Street - Temporary traffic signals in operation to facilitate road works.
From: Wednesday 21 November 2018
To: Sunday 09 December 2018
Last updated 11:51 Thursday 22 November 2018 : Road is open. Traffic is flowing well.
Works | Utility
[B300] Baylis Road (SE1) (Southbound) at the junction of Waterloo Road - Road closed to facilitate electrical connection works. (Continuous)
From: Wednesday 21 November 2018
To: Ongoing
Last updated 16:13 Thursday 22 November 2018 : Approach with caution.
Infrastructure Issue | Traffic Signal
[A5200] York Way (N1/N1C) (All Directions) at the junction of Goods Way - Traffic signals are not working.
From: Monday 29 October 2018
To: Thursday 23 December 2021
Last updated 07:30 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Bronze Street - Contraflow in place, reducing both directions to one lane, for Thames Tideway works.
From: Monday 19 November 2018
To: Thursday 22 November 2018
Last updated 10:51 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A219] Wimbledon Park Side (SW19) (Both Directions) at the junction of Inner Park Road - Two way temporary traffic signals are in operation to facilitate Thames Water connection works.
From: Monday 19 November 2018
To: Friday 23 November 2018
Last updated 08:02 Thursday 22 November 2018 : Delays are possible.
Works | Utility
Highfield Avenue (NW11) (Both Directions) at the junction of Brent Court - Two way temporary traffic signals are in operation to facilitate Thames Water connection works.
From: Friday 08 January 2016
To: Friday 29 March 2019
Last updated 11:42 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A104] Lea Bridge Road (E5 /E10) (Both Directions) between Lea Bridge Roundabout and Whipps Cross Roundabout - Various restrictions for Mini-Holland cycle scheme works. More information on the Mini-Holland schemes.
From: Tuesday 03 May 2011
To: Friday 30 November 2018
Last updated 08:46 Thursday 22 November 2018 : Delays are possible.
Works | TfL
Victoria Area (All Directions) - Due to two ongoing major engineering projects (Victoria Station Upgrade and Victoria Circle Development) there are numerous restrictions in place around the Victoria one-way system. Wilton Road is restricted to buses, taxis and cycles north of Neathouse Place and is reduced to one lane approaching Terminus Place. In addition Hudson's Place is restricted to taxis only. [A302] Victoria Street is restricted between [A202] Bressenden Place and [A3214] Buckingham Palace Road. href="https://www.tfl.gov.uk/travel-information/improvements-and-projects/victoria">Find out more..
From: Monday 17 September 2018
To: Wednesday 06 March 2019
Last updated 07:41 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A215] Denmark Hill (SE5) (Northbound) at the junction of Ashworth Close - The bus lane is closed due to works.
From: Monday 19 November 2018
To: Friday 30 November 2018
Last updated 16:40 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[B552] The Ridgeway (NW7) (Both Directions) at the junction of Partingdale Lane - Two way temporary traffic signals in place to facilitate Affinity works.
From: Wednesday 12 September 2018
To: Tuesday 18 December 2018
Last updated 08:30 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A40] Oxford Street (W1K/W1C) (Westbound) at the junction of Orchard Street - Temporary signals operating during gas main and footway repairs. .
From: Wednesday 17 October 2018
To: Friday 14 December 2018
Last updated 11:44 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A123] Cranbrook Road (IG6) (All Directions) at the junction of Brandville Gardens - Temporary traffic lights are in operation to facilitate gas works.
From: Tuesday 20 November 2018
To: Thursday 22 November 2018
Last updated 10:52 Thursday 22 November 2018 : Delays are possible.
Works | Utility
Nightingale Place (SE18) (All Directions) at the junction of Nightingale Vale - Temporary traffic signals in use to facilitate Thames Water works.
From: Thursday 22 November 2018
To: Sunday 06 January 2019
Last updated 13:42 Thursday 22 November 2018 : Traffic is flowing well.
Special and Planned Events | Exhibition
Hyde Park (W1K) (All Directions) - The annual Winter Wonderland event will be taking place within Hyde Park. Event times are 1000 - 2200hrs daily except for Christmas day. Expect larger than usual numbers of pedestrians in the Hyde Park Corner, Marble Arch and Park Lane areas. South Carriage Drive will be closed as and when crowd numbers dictate
From: Wednesday 14 November 2018
To: Monday 17 December 2018
Last updated 11:54 Thursday 22 November 2018 : Delays are possible.
Works | Borough
[A106] Wick Road (E9) (All Directions) at the junction of Kenworthy Road - Lane two of two is closed bus stop works.
From: Thursday 22 November 2018
To: Friday 23 November 2018
Last updated 15:07 Thursday 22 November 2018 : No restrictions at this time. Traffic is flowing well.
Works | Borough
[A118] High Street (E15/E3) (Eastbound) between Blaker Road and Warton Road - Lane one (of two) is closed to facilitate carriageway repair works.
From: Thursday 22 November 2018
To: Wednesday 28 November 2018
Last updated 14:44 Thursday 22 November 2018 : Traffic is flowing well.
Works | Utility
[A503] Camden Road (NW1) (Northbound) at the junction of Bonny Street - Lane one (of two) is blocked due to UKPN works.
From: Tuesday 13 November 2018
To: Friday 21 December 2018
Last updated 11:54 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A123] Cranbrook Road (IG6) (All Directions) at the junction of Beattyville Gardens - Two way temporary traffic signals are in place during essential gas works.
From: Tuesday 20 November 2018
To: Monday 26 November 2018
Last updated 10:43 Thursday 22 November 2018 : Delays are possible.
Works | Emergency
[A215] Shirley Road (CR0) (All Directions) at the junction of Lower Addiscombe Road - Three way temporary traffic signals are in operation to facilitate works.
From: Monday 12 November 2018
To: Friday 30 November 2018
Last updated 08:01 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[B238] Peckham Rye (SE15/SE22) (All Directions) at the junction of Friern Road - From 0900hrs on Monday 12 November until 1700hrs Friday 30 November, two way temporary traffic lights are in place during daily gas connection works by SGN.
From: Tuesday 20 November 2018
To: Tuesday 27 November 2018
Last updated 07:02 Thursday 22 November 2018 : Traffic is flowing well on approach.
Works | Utility
[A4] Piccadilly (W1J) (Eastbound) at the junction of Brick Street - Works are confined to the footway.
From: Tuesday 20 November 2018
To: Friday 23 November 2018
Last updated 16:28 Thursday 22 November 2018 : Expect delays.
Works | Utility
[A110] Windmill Hill (EN2) (Both Directions) at the junction of Florence Avenue - Two way temporary traffic signals are in operation to facilitate Thames Water mains repair works.
From: Tuesday 20 November 2018
To: Tuesday 27 November 2018
Last updated 16:40 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A407] Walm Lane (NW2) (All Directions) at the junction of Station Parade - Two way temporary traffic signals are in operation to facilitate Cadent Gas works.
From: Monday 19 November 2018
To: Friday 30 November 2018
Last updated 08:26 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A402] Notting Hill Gate (W8) (Westbound) at the junction of Palace Gardens Terrace - Lane one closure in place to facilitate UKPN works.
From: Tuesday 20 November 2018
To: Sunday 02 December 2018
Last updated 08:27 Thursday 22 November 2018 : Local delays likely
Works | Utility
[A4020] Oxford Road (UB8) (All Directions) at the junction of Newtown Road - Temporary signals for works
From: Monday 19 November 2018
To: Wednesday 28 November 2018
Last updated 08:02 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A232] Crofton Road (BR6) (All Directions) intersecting Station Road - Temporary traffic signals are in operation to facilitate gas connection works.
From: Thursday 14 September 2017
To: Thursday 31 December 2020
Last updated 07:39 Thursday 22 November 2018 : Delays are possible.
Special and Planned Events | Construction Activity
[A400] Charing Cross Road (WC2H) (Southbound) between Tottenham Court Road Underground Station South Plaza and Denmark Street - The bus lane is closed for the consolidated building development until late into 2020.
From: Saturday 20 October 2018
To: Friday 30 November 2018
Last updated 11:53 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A124] Longbridge Road (RM8) (All Directions) at the junction of Lodge Avenue - Restrictions in place to facilitate utility works.
From: Saturday 27 October 2018
To: Thursday 22 November 2018
Last updated 10:46 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A214] Upper Elmers End Road (BR3) (All Directions) at the junction of Abbots Way - Two way temps due to Thames Water sewer repair works.
From: Wednesday 21 November 2018
To: Friday 23 November 2018
Last updated 13:57 Thursday 22 November 2018 : Traffic is slow on approach. Expect delays.
Works | Utility
[B317] North End Road (W14) (Both Directions) at the junction of Archel Road - Two way temporary traffic signals are in operation to facilitate UKPN works.
From: Thursday 08 November 2018
To: Thursday 22 November 2018
Last updated 10:48 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A2216] Grove Lane (All Directions) at the junction of Champion Park - Temporary traffic signals in operation to facilitate UKPN works.
From: Thursday 22 November 2018
To: Ongoing
Last updated 14:46 Thursday 22 November 2018 : There are no reported delays.
Works | Utility
Du Cane Road (W12) (All Directions) at the junction of Fitzneal Street - Three way temporary traffic signals in operation to facilitate Thames Water works.
From: Monday 24 July 2017
To: Sunday 31 March 2019
Last updated 07:25 Thursday 22 November 2018 : Lane Restrictions in place. Delays possible.
Works | Other
[A5201] Clerkenwell Road (EC1M) (Both Directions) at the junction of Britton Street - The carriageway is restricted for building works.
From: Thursday 22 November 2018
To: Sunday 25 November 2018
Last updated 08:29 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A4206] Harrow Road (W2) (Westbound) at the junction of Marylebone Flyover - Lane one (of two) obstructed due to works by Thames Water.
From: Monday 12 November 2018
To: Sunday 25 November 2018
Last updated 16:41 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A315] Glenthorne Road (W6) (All Directions) at the junction of Studland Street - Contractors on behalf of Thames Water will be working carrying out trial holes along Glenthorne Road in preparation for future works. To enable this there will be lane closures around the excavations as the contractors work down the road.
From: Sunday 07 October 2018
To: Sunday 31 March 2019
Last updated 16:41 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A400] Hampstead Road (NW1) (Northbound) at the junction of Granby Terrace - Bus lane closure in place to facilitate HS2 works. Temporary traffic signals will also be in use.
From: Wednesday 21 November 2018
To: Thursday 22 November 2018
Last updated 10:49 Thursday 22 November 2018 : Delays are possible.
Works | Utility
[A211] Maidstone Road (DA14) (All Directions) at the junction of Palm Avenue - Two-way temporary traffic lights are in operation to facilitate works by Openreach.
From: Friday 08 September 2017
To: Friday 06 September 2019
Last updated 16:41 Thursday 22 November 2018 : Delays are possible.
Works | Other
[A41] Finchley Road (NW3) (Northbound) at the junction of Lithos Road - Intermittent lane restrictions for loading and unloading during building works.