The new high frequency, metro railway for London and the South East

From 2018 Crossrail trains will travel from Maidenhead and Heathrow in the west to Shenfield and Abbey Wood in the east via new twin tunnels under central London.
In 2009 Studio 24 was appointed by Crossrail as their sole supplier of website services, for a period of three years.
The initial phase of work required Studio 24 to support the existing corporate website powered by a third party content management system (CMS). Given limitations with the third party CMS and the required expansion of the site, it was decided that the site architecture be redeveloped on a new more stable CMS platform.

“Since we have worked with Studio 24 we have been impressed by their level of technical and design competency and overall professionalism.
William Moore, Crossrail

Re-launched in 2010, the new website was powered by the Studio 24 CMS, to give the client as much content flexibility as possible.
The CMS also allows the client to maintain multiple websites, a necessity once a second, educational Crossrail website was built in 2011. Other bespoke pieces of functionality have been developed since the sites re-launch, including a postcode search tool (‘Near You’) that allows users to identify construction work that is happening in their area.
Towards the end of 2012, Studio 24 began a new project with Crossrail to re-design the site using reponsive design technology. This allowed Crossrail to dictate what important content is shown, in what relevant format for any mobile device and the new look site was launched in February 2013. Within the first 6 months after it's relaunch, Crossrail saw an 80% increase of visitors to the site from mobile devices.